[  ](https://www.fountom.com/images/projects/Y25/Y25_steel_plates_1.webp)

 ![](https://www.fountom.com/images/projects/Y25/Y25_steel_plates_1.webp)

 [  ](https://www.fountom.com/images/projects/Y25/Y25_steel_plates_2.webp)

 ![](https://www.fountom.com/images/projects/Y25/Y25_steel_plates_2.webp)

# 1 new ordered shipment of steel plates to Chile

Fountom just delivered a shipment of steel plates to Chile in October 2018. All products are subject to LR certification and are finished in 40 days.

Certificate: LR

Delivery time: 40 days against confirmation of drawings and down deposit.

 | ****Item**** | ****Grade**** | ****TK.****  ****(mm)**** | ****Width****  ****(mm)**** | ****Length****  ****(mm)**** | ****Unit Weight****  ****(MT)**** | ****PCS**** | ****Condition****  ****of** **delivery**** | ****Total weight****  ****(MT)**** |  |
|---|---|---|---|---|---|---|---|---|---|
| STEEL PLATES（Shot blasting and shop primer standard sa2.5(2.5), 4 sides of plate should be cut. Paint color: Grey. |
| 01 | LRA | 6 | 2450 | 12000 | 1.385 | 500 | AR | 692.500 |  |
| 02 | LRA | 8 | 2450 | 12000 | 1.846 | 18 | AR | 33.228 |  |
| 03 | LRA | 10 | 2450 | 12000 | 2.308 | 6 | AR | 13.848 |  |
| 04 | LRA | 12 | 2450 | 12000 | 2.769 | 2 | AR | 5.538 |  |
| 05 | LRA | 16 | 2450 | 12000 | 3.693 | 4 | AR | 14.772 |  |
| TOTAL: | 530 |  | 759.886 |  |

Project Details

Delivery Date:

 October, 2018

Product Category:

Shipbuilding Material

Country / Region:

 Chile
