[  ](https://www.fountom.com/images/projects/Y17/Y17_rudder_system_1.webp)

 ![](https://www.fountom.com/images/projects/Y17/Y17_rudder_system_1.webp)

 [  ](https://www.fountom.com/images/projects/Y17/Y17_rudder_system_2.webp)

 ![](https://www.fountom.com/images/projects/Y17/Y17_rudder_system_2.webp)

# 4 shipsets new order of rudder system from Bangladesh

In December 2018, Fountom received another 4 ship sets order from Bangladesh. This order is mainly rudder system. It took us a total of 60 days to design and manufacture them and were finally delivered to Bangladesh successfully.

Delivery time: 50 days against confirmation of drawings and down deposit.

 | 1 | Rudder stock with standard accessories | Dimensions and Accessories as per standard and approved drawings | Forged steel | 8sets |
|---|---|---|---|---|

List of parts per set

 | 1 | Rudder stock | φ200×4815  Flange 700×500×50 | Forged steel | 1 |
|---|---|---|---|---|
| 2 | Rudder stock tube | φ323.9×φ12.7×3165 | Mild steel | 1 |
| 3 | Front pipe(Inside rudder plate) | φ139.7×12.5×2300 | 1 |
| 4 | (Inside rudder plate)  Aft round bar | φ25×2300 | 1 |
| 5 | Rudder stock upper ling | φ230×φ200×410 | Stainless steel | 1 |
| 6 | Rudder stock lower liner | φ230×φ200×440 | 1 |
| 7 | Upper bearing | φ273×φ233×200 | High polymer | 1 |
| 8 | Lower bearing | φ273×φ233×200 | 1 |
| 9 | Upper bearing pedestal | φ350×φ240×350 | Mild steel | 1 |
| 10 | Lower bearing pedestal | φ350×φ240×260 | 1 |
| 11 | Packing gland | φ350×15×φ269×φ233×60 | Gunmetal | 1 |
| 12 | Jumping clamp | H=160 | Mild steel | 1 |
| 13 | Check ring | φ350×φ233×15 | 1 |
| 14 | Packing | As per standard | [Pledget](#keyfrom=E2Ctranslation) | 1 |

| 15 | Horizontal flange couplings fitted bolt | M36×170 | Forged steel | 8 |
| 16 | Horizontal flange couplings fitted nut | M36 | Mild steel | 8 |
| 17 | Horizontal flange couplings fitted washer | M36 | 8 |
| 18 | Eye bolt | M24 | Mild steel | 1 |
| 19 | Tiller key | 250×50×20 | 2 |
| 20 | Coupling key | 150×25×20 | 1 |
| 21 | Tiller key securing screw | M10×30 | 4 |
| 22 | Coupling key securing screw | M10×30 | 2 |
| 23 | Packing gland bolt | M16×50 | 2 |
| 24 | Locking bolt | M16×50 | Stainless steel | 6 |
| 25 | Clamp bolt | M16×80 | 6 |
| 26 | Clamp nut | M16 | 6 |
| 27 | Clamp washer | M16 | 6 |
| 28 | Filling plug | M30 | Stainless steel | 1 |
| 29 | Drain plug | M30 | Stainless steel | 1 |
| 30 | Rudder blade flange | 700×700×50 | Forged steel | 1 |
| 31 | Rudder bottom assembly | As per standard | Assembly | 1 |
| 32 | Upper rudder bearing | C200 | Assembly | 1 |
| 33 | Upper rudder bearing seat | As per standard | Assembly | 1 |

![Y17 rudder system design 1](https://www.fountom.com/images/projects/Y17/Y17_rudder_system_design_1.webp)

![Y17 rudder system design 2](https://www.fountom.com/images/projects/Y17/Y17_rudder_system_design_2.webp)

Project Details

Delivery Date:

 October, 2018

Product Category:

Propulsion System

Country / Region:

 Bangladesh
